Jump to content

I got a cmbo, bridge question..


Recommended Posts

The connecting roads should be 2 levels higher then the elevation of the tile where you place the crossing. (or 4 levels higher, in case of a large bridge) In other words, your stream should be 2 levels (or 4) lower then the surrounding ground.

If you want to learn more about how to place bridges, create smooth river banks or just design a nice map, I suggest you take a look at my Tips and Tricks of CM Scenario Design Page

It was created for CMBO, but it's of course valid for CMBB too...

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...